Preliminary Plan Hearing April 5, 2011 @ 8 p.m. in the Town Room at Town Hall

Project Information

This project is to replace and repair the existing sidewalk and parking lot areas between South Pleasant Street and Boltwood Ave.

The project includes:
    1. Upgrades to the sanitary sewer system to correct capacity issues on South Pleasant St.
    2. Drainage system upgrades
    3. Street light upgrades
    4. Parking lot upgrades
    5. Sidewalk upgrades to meet the Downtown standards